top of page
WORK
WORK
MARIBETH RENTSCHLER
ARCHITECT: FVHD ARCHITECTS + PLANNERS
COMPLETED: JULY 2015
ROLE: INTERN ARCHITECT, Assisted with Schematic Design through Design Development, creating
models and renderings for community meetings
The addition of 37,000 SF to the existing elementary school building provides better vehicular access, separate from the school entrance, administration and registration. A combination of community use and academic spaces were designed to integrate numerous state-of-the-art design, technology, security and mechanical system features. The project was designed and built to meet LEED Silver sustainability standards.
MONARCH WATCH MULTI-FAMILY
ARCHITECT l NCARB CERTIFIED
AKA HOTEL FACADE + INTERIOR RENOVATION

ARCHITECTS: STANEV POTTS ARCHITECTS
COMPLETED: APRIL 2019
ROLE: DESIGNER + PROJECT MANAGER
The hotel renovation consisted of a complete lobby refresh and a new facade entrance that is now more consistent with the historic architecture of the 1913 building. A ten foot deep, cantilevered canopy with signage now greets its users from afar and brings more presence to the streetscape.
The interior of the lobby has a minimal, but bold aesthetic that now has better flow for those staying at the hotel. A fifteen foot high by five foot wide moss wall balances the crisp black and white finishes and greets guests as a focal point at the main entrance.
Renovating the existing hotel included a preliminary process of obtaining approvals from multiple departments in the city of Philadelphia, which included presentations to both the Philadelphia Historic Commission Board and the Philadelphia Art Commission.




HOTEL LOBBY

5'x15' GREEN WALL

VIEW FROM WAITING AREA

RECEPTION
DISCLAIMER: DRAWINGS, RENDERINGS AND PHOTOS ARE PROPERTY OF STANEV POTTS ARCHITECTS
bottom of page